- Commissioning and Qualification strategy

- Revamping of a sterile production workshop

- Laboratory equipment’s Qualification

- SCSE building Validation

- Suppliers inspection for critical equipments and installations

- Summary draft on project of laboratory CQ

- Follow-up and treatment of none conform tests

- BPF engineering training

- Utilities management quality (HVAC, steam, purified water)

 

 


- Laboratory equipments installation (washing machine, laminar flow, insulator, autoclave)

- PQ assistance on washing machine

- Commissioning assistance and HVAC, utilities, equipments qualification…

 

 

 


- Qualification, SAT / IQ / OQ on HVAC, purified water loops

 

 


- H2O2 decontamination

- Project assistance for buildings, process, utilities …

 


- Revamping of packaging vaccine workshop 


 


- Project assistance on project of production capacity extension

- Engineering of a washing machine

- AMDEC to chromatography stage, upgrading of software to chromatography…

- Audit of a pure steam generator

- IQ, OQ of a pasteurization system

 


- IQ / OQ “vaccine tank” and engineering on Mobile CIP 

- Mobile CIP for process tank

 
-C all for bid and technical alignment for purified water loop project
 

- Writing and execution of FAT / SAT / IQ / OQ tests on manufacturing skid

- Cleaning test on process tank

 



- FAT / SAT protocols for Stainlessteel equipments

 

 



- Replacement of a dust extraction system in a weighing ATEX area 

 



- Feasibility study of a bio production workshop 

 



- Validation main plan for a project of segregation zones between primary and secondary areas